Sanitary service obligations on site: what you must have in place

Size your project

What a hygiene audit actually checks

The review rarely starts by counting units. It starts by asking whether records exist. A work front with the right number of toilets and no service log defends itself worse than one with a unit fewer and a complete history, because the first is visible and the second is provable.

CheckpointWhat is usually requiredHow it is resolved
AvailabilityEnough units, reachable from every frontSizing by headcount and number of fronts
ConditionClean units with consumables in placeService frequency matched to real usage load
RecordsEvidence of every maintenance visitPer-unit log with date and work performed
AccessibilityProvision for personnel with disabilitiesAccessible unit on top of the general quota
Waste handlingDocumented removal and disposalSewer service with proof of each visit

Five questions worth having answered in writing

  • How many people are on site per shift, not just in the project’s total headcount?
  • How many separate work fronts exist, and how far is the nearest unit from each?
  • How often is maintenance performed, and who signs the record?
  • Is there an accessible unit, and is it installed at ground level?
  • Where is waste removal documented, and who keeps that record?

What Saniprof delivers on this point

Sizing against a documented criterion, service frequency agreed in writing in the quote, and a log of every visit. Those three documents are what corporate clients typically request when auditing a contractor, and they are the supplier’s responsibility, not the site manager’s.

Frequently asked questions

Who is responsible for toilets on a construction site?

The obligation to provide them rests with the employer. Operation can be contracted to a supplier, but responsibility for their existence, cleanliness and record-keeping does not transfer: hence the contract should state service frequency and log delivery.

Is an accessible unit needed if no staff have disabilities?

It is advisable. Personnel change over the project, and visitors, supervisors and client staff enter the site. Saniprof sizes it as an additional unit on top of the general quota, not as a replacement for a standard one.

Size your project in under a minute

Three screens: project, scale and contact. You get the configuration and the unit breakdown, with no price invented.

Open the calculator

Short answer

In Mexico, the employer is obliged to provide sanitary services to personnel at the workplace, keep them in hygienic condition and document the service. The exact number of units and the applicable conditions depend on the type of facility and must be confirmed with the project’s health and safety function.